If you ship installable apps, mobile apps or software with a purpose-built backend to customers in the EU, CRA Article 14 reporting has applied since 11 September 2026. According to the European Commission, manufacturers must report actively exploited vulnerabilities and severe incidents: an early warning within 24 hours of becoming aware, and a full notification within 72 hours. Many teams still plan around December 2027, but that date belongs to the main obligations, not to reporting.

This is a short runbook, not a compliance programme. Eight steps, each small enough to finish in a day or two, and one rehearsal to prove they work. Article 14 is much narrower than the full 2027 programme, so resist the urge to over-build.

CRA Article 14 reporting: what has been live since 11 September 2026

The Commission's reporting page sets the clocks:

Report Deadline
Early warning within 24 hours of becoming aware
Notification within 72 hours of becoming aware
Final report (vulnerability) no later than 14 days after a corrective measure is available
Final report (severe incident) within a month of the 72-hour notification

A few scope points that surprise teams:

  • Installed base counts. ENISA's FAQ points to the Commission FAQ, which says Article 14 applies from 11 September 2026 to all in-scope products, including those placed on the market before 11 December 2027.
  • Not retroactive. Kirkland & Ellis notes that if you knew of both the vulnerability and its active exploitation before 11 September 2026, you need not report. If you learn of the exploitation only after that date, you must.
  • Two kinds of events. An actively exploited vulnerability needs reliable evidence of exploitation without the owner's permission. Finding a flaw through testing or responsible disclosure does not by itself trigger reporting. A severe incident needs no exploited vulnerability; per Pillsbury's note it includes incidents that compromise, or could compromise, the product's ability to protect sensitive or important data or functions.
  • Users too. Goodwin adds that manufacturers must inform affected users without undue delay and explain protective steps where needed.
  • Penalties. Breaching the reporting obligations may bring fines up to €15 million or 2.5% of worldwide annual turnover, whichever is higher (Goodwin).

Steps 1–2: scope map and the awareness definition

Step 1: build a one-page scope map

List every product you ship and decide, per product, whether Article 14 applies. Keep one page per product with the decision and the reasoning.

ENISA confirms that the Commission published its CRA implementation guidance on 27 July 2026. We have not worked from the guidance text itself; the following comes from explainers summarising it, such as the Lemniscate Growth piece, so confirm the details with counsel:

  • Software that runs on the user's device is a product.
  • A browser-only web app generally is not, unless it counts as remote data processing that supports a product.
  • The test asks two questions: would the product lose a function without the processing, and was the software built by or under the manufacturer's responsibility?
  • A third-party SaaS built into a product is treated like a component. Internal CRM, HR and CI/CD systems are not remote data processing.

In practice: a mobile app plus the API it cannot work without is likely in. A marketing site or browser-only dashboard is likely out. Per the same explainer, scope follows the EU market, not the vendor's headquarters, which is why Turkish and UK vendors with EU customers should do this exercise.

Step 2: define “awareness” and who timestamps it

Every deadline runs from becoming aware. Write down:

  1. Who decides that reliable evidence of exploitation exists (name a role and a deputy).
  2. Which signals count: a customer report, a threat-intel hit, an anomaly in your logs, a vendor advisory.
  3. Where the timestamp is recorded, with timezone, the moment that decision is made.

Avoid vague wording like “when the team is reasonably sure”. A named decider and a timestamped record make the clock defensible later.

Steps 3–4: filers, accounts and your coordinating CSIRT

Step 3: name two filers and create their EU Login accounts

Notifications go through ENISA's Single Reporting Platform (SRP), operational since 11 September 2026 and mandatory for notifications from that date. Registration authenticates through EU Login, and ENISA requires an EU Login account with multi-factor authentication (MFA) enabled. The accounts are personal, so each filer uses their own. Name at least two people who can file out of hours, so one holiday or one flight does not break a 24-hour clock.

ENISA's FAQ advises registering when you need to submit rather than pre-emptively, but it also says registration takes only a few minutes if the representative already has an active EU Login account. Our reading: create the EU Login accounts now, switch on MFA, and keep the platform registration itself ready to complete. Kirkland & Ellis goes further and advises completing registration before any incident; ENISA's own advice is the opposite, so decide this with counsel. The CSIRT validates an Assigned Representative's authority after first access, in parallel with reporting, and this does not block submission.

One limit to plan around: per ENISA's FAQ there is one Primary representative per manufacturer and up to 20 Secondary ones, and a Secondary can join only by invitation from a Primary whose association the CSIRT has already marked “Verified”. The invitation expires after 7 days. So your second filer cannot be added to the platform until the first one has registered and been validated. Decide who registers as Primary, and make sure the backup can also register as Primary if that person is unreachable.

Two practical notes from ENISA's pages: the platform has been English-only since launch, so prepare English text in advance. And if the SRP is temporarily unavailable, ENISA says to wait until it is back and then submit. If you think immediate communication is needed in the meantime, you may contact your designated CSIRT directly, but the notification must still go through the SRP once it is available. Log the outage and your attempts in your own record.

Step 4: identify your coordinating CSIRT and record why

Per ENISA's FAQ, you generally report to the coordinating CSIRT in the Member State of your main establishment in the EU, meaning the place where decisions on the cybersecurity of your products are predominantly taken. ENISA receives the notification at the same time, and the CSIRT passes it on to other relevant CSIRTs. ENISA's registration guide says the manufacturer must identify the correct coordinating CSIRT under Article 14(7), and the FAQ warns that a notification sent to the wrong one may be invalidated and have to be resubmitted.

If your company has no main establishment in the EU, ENISA's FAQ gives an order to follow:

  1. The Member State where your authorised representative acts for the highest number of your products.
  2. If that does not apply, the Member State where the importer places the highest number of your products on the market.
  3. If that does not apply, the Member State where the distributor makes the highest number of your products available.
  4. If none applies, the Member State with the highest number of users of your products.

For an app sold directly through app stores, the last rule is often the one that decides, so keep a per-country user count to hand. What ENISA's pages do not spell out is how the legal authorised representative relates to the platform's Assigned Representative role. Ask counsel, and write the chosen CSIRT and the reasoning into the runbook.

Steps 5–6: templates and your own clock

Step 5: pre-write four documents

Prepare drafts so that nobody writes from a blank page at 3 a.m.:

  1. Early warning (24 hours). Product, affected versions, what you know, what you do not yet know.
  2. Notification (72 hours). More detail on the issue, impact and mitigations.
  3. Final report. Root cause, fix or corrective measure, lessons learned.
  4. Customer notice. Plain language: what happened, who is affected, what they should do.

ENISA marks its platform guidance as subject to change, so do not copy field names into your templates. Link to ENISA's live pages in the runbook instead.

Step 6: keep your own deadline clock

Start a clock from the awareness timestamp and compute three absolute deadlines: 24 hours, 72 hours, and the final report date. Put them in a ticket, a shared calendar entry or a small script. Do not rely on counters inside the filing platform as your legal clock; they are a convenience, and the obligation runs from your awareness.

Also know how the platform behaves: a saved draft is visible only to its creator, so a colleague cannot finish it for you. A submitted notification moves to “Early Warning”, and other concerned CSIRTs receive it only after manual dissemination by the coordinating CSIRT. Submit early, then update.

Steps 7–8: rehearse and fix the contracts

Step 7: run one tabletop

Pick a realistic scenario, for example a customer reports that an exploit for your mobile API is circulating. Walk through it with a timer:

  • Who declares awareness, and when is it stamped?
  • Can both filers sign in to EU Login with MFA right now?
  • Can someone produce an English early warning from your template within the hour?
  • Who writes the customer notice?

Record the gaps and fix them. One honest rehearsal beats a polished policy nobody has tried.

Step 8: settle “manufacturer” in your contracts

If you build custom software for clients, or buy it from an agency, state in the contract who the manufacturer is and who runs reporting, including who must notify whom and within what hours. The sources used here do not settle how tailor-made software is treated, so this is a question for counsel, but an unclear contract is a risk in either case. Third-party components deserve a line too: according to Kirkland & Ellis, reporting is required only if the component vulnerability is exploitable and has been exploited in your own product. Otherwise reporting is voluntary, but you must still address it and report it upstream under Article 13 (the same note dates the Article 13 duty from 11 December 2027).

What not to build yet

Voluntary reporting under Article 15 is planned for a future phase of the platform. Open-source stewards' reporting obligations start on 11 December 2027, per the Commission. A Digital Omnibus proposal that would create a single ENISA entry point for several regimes is, per a 13 November 2026 note, only a proposal. Do not design around any of these.

Key takeaways

  • CRA Article 14 reporting has applied since 11 September 2026, including to products already on the market.
  • Clocks: 24-hour early warning, 72-hour notification, final report within 14 days of a corrective measure (vulnerabilities) or a month after the 72-hour notification (severe incidents).
  • Write a one-page scope decision per product and confirm scope questions with counsel.
  • Name who declares awareness and timestamp it.
  • Have two filers with EU Login accounts and MFA, English templates ready and your coordinating CSIRT recorded with reasons.
  • Run your own deadline clock and rehearse once.
  • Put the manufacturer and reporting duties into custom-software contracts.